Here is a pic of the first tower for the gate. The bottom floor is almost complete. This weekend I will start the second tower and building the bridge across. I also have enough basic blocks to start work on a wizard tower.

The casting process head gotten a lot better. Recent casts have almost no air pockets. Hopefully I can fix the vibration table this weekend and eliminate any more air pockets.