WIP: Temple of Aradoth update 2

Ok so I have finished the main temple. I might decide to put a roof on it but right now I like it open aired. I ran into some issue putting in the pillars and getting everything to line up the way I wanted. I tried dry building the pillar section upside down first and then putting all the pillars on at once but it didn't quite line up right. That's ok though, I am not concerned about high quality right now and mostly about getting designs completed and learning from the construction.

The piece is still going to look amazing once painted and placed on the base with the bridge. Here are some pics!